Sign In | Join Free | My spintoband.com
China Jinzhou City Shitan Machinery Equipment CO. LTD. logo
Jinzhou City Shitan Machinery Equipment CO. LTD.
Jinzhou City Shitan Machinery Equipment CO. LTD Drilling Rig / Drill Rod / Drill Bit / Track Transporter / Drilling Mud Pump
Verified Supplier

8 Years

Home > Water Well Drilling Rig >

Fast Speed Deep Borehole 350 Meters Water Well Drilling Rig For Industry Business

Jinzhou City Shitan Machinery Equipment CO. LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Fast Speed Deep Borehole 350 Meters Water Well Drilling Rig For Industry Business

  • 1
  • 2

Brand Name : ShiTan

Model Number : ST 350

Certification : ISO9001

Place of Origin : China

MOQ : 1 set

Price : Negotiation

Payment Terms : T/T, Western Union

Supply Ability : 20000 sets per year

Delivery Time : Within 7-12 days

Packaging Details : Wooden box

Product Name : Fast Speed Deep Borehole 350 Meters Water Well Drilling Rig

Color : Red Yellow Blue

Feature : High Drilling Efficiency

Application : Water Well drilling

Power Type : Diesel

Drilling Depths : 350 meters

Drilling Hole Diameters : 105-305 mm

Warranty : 1 Year

Voltage : 220V/380V

Length of drill pipe(mm) : 3m

Condition : New

After-sale Service : Working Video Support

Contact Now

Fast Speed Deep Borehole 350 Meters Water Well Drilling Rig For Industry Business

Fast Speed Deep Borehole 350 Meters Water Well Drilling Rig

ST 350 Water Well Drilling Machine Introduction

It is mainly used to drilling wells,irrigation wells,ground source heating pump wells and boreholes ,especially for mountain and rock formation well projects,the drilling depth is 350 meters ,hole-diameter is 105-350 mm ,lift power is 24MT.

ST 350 Water Well Drilling Machine Tech Details

Drilling depth 350m
Dia.hole φ105-305mm
Advance Length one time 6.6m
Working pressure 1.7-3.3MPa
Air consumption 17-35m³/min
Length of rod 1.5m,2m,3m, (6m can be choosed)
Dia. Of rod φ89,φ102,φ114
Lifting power 24T
Rotation torque 6200-8500 N.m
Rotation Speed 55-115r/min
Diesel Engine Yuchai
Engine Power 85Kw/2200rpm
Travelling speed
0-2.5 Km/h
Climb capacity 30°
Weight 9000kgs
Dimension 5500x1900x2780mm
Application Complicated geological conditions: Rock, Mud, Sand etc.
Drilling Way Top drive hydraulic rotary and propulsion, Dth Drilling or Mud Pump Driling
DTH Hammer 4",5",6",8",10" Drill hammer or CIR110, 130, 150,170

ST 350 Water Well Drilling Machine Advantages

With hydraulic technology,supporting high torque hydraulic motor rotation and large bore hydraulic cylinder push, the multi cylinder engine of famous factory provides power for the hydraulic system, two stage air filter, air compressor air intake design

High oil temperature in the drill process

The high temperature in the drilling rig is generally divided into the high temperature of the gearbox, the high temperature of the hydraulic oil, and some are the high temperature of the engine cooling liquid. In fact, the reason for the high temperature of the gearbox is very simple. The main reason is that the size and shape of the bearing or gear and housing are not standard or the oil is unqualified. Now let's give you a detailed analysis.Hydraulic oil temperature is too high:

First of all, the temperature of hydraulic oil is too high. According to hydraulic theory and maintenance experience in recent years, the main reason for the high temperature of hydraulic oil is too fast heat generation and too slow heat dissipation. The oil inlet pipeline and hydraulic oil tank of the hydraulic pump are not sealed tightly, the oil inlet filter element is blocked, the hydraulic system pipeline is not unblocked, and the internal leakage of the hydraulic pump will cause a large amount of heat to be generated in the hydraulic oil, so that the temperature of the hydraulic oil will rise rapidly due to excessive heat generation.

What aspects should we pay attention to in the drilling process of water well drilling rig?

Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.

1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.

2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.

3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.

Fast Speed Deep Borehole 350 Meters Water Well Drilling Rig For Industry Business

Fast Speed Deep Borehole 350 Meters Water Well Drilling Rig For Industry Business

Fast Speed Deep Borehole 350 Meters Water Well Drilling Rig For Industry Business







Product Tags:

Fast Speed Borehole Drilling Machine

      

350 Meters Water Well Drilling Rig

      

3m Length Deep Well Drilling Machine

      
Wholesale Fast Speed Deep Borehole 350 Meters Water Well Drilling Rig For Industry Business from china suppliers

Fast Speed Deep Borehole 350 Meters Water Well Drilling Rig For Industry Business Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0